How Do You Score a Bid/No-Bid Decision for a Public Tender?

A scoring matrix does not make the decision for you. It makes the reasons visible, so the same tender gets the same answer whoever reviews it.

TenderFaro Editorial TeamPublished 2026-11-25Updated 2026-11-259 min read

Part of the guide to tender qualification.

On this page

Why score a tender at all?

A scoring matrix does not make the decision for you. It makes the reasons visible, so the same tender gets the same answer whoever reviews it, and so you can explain a "no" to the person who wanted a "yes". The method below has three layers: knock-out questions that end the review on their own, weighted criteria scored from 1 to 5, and a threshold that turns the score into bid, discuss or no-bid. A template you can copy is near the end.

Most teams already make a bid/no-bid decision. The trouble is that they make it in a hallway, from the notice summary, after someone has started writing. Teams that lose days to poor-fit bids rarely lacked information. They lacked a moment where the information was put side by side. A matrix gives you three things:

  • Consistency: the commercial lead and the technical lead score the same criteria, so a disagreement is about a fact, not a mood.
  • Comparison: when two tenders close in the same week, you can see which one deserves your best writer.
  • A record: six months later, you can see why you passed, and whether that reasoning held up.

Step 1: Ask the knock-out questions first

Some conditions cannot be averaged away. A great strategic fit does not compensate for a missing mandatory certificate. So before any scoring, answer these as yes or no from the full tender pack, not the notice:

  • Can we meet every mandatory eligibility condition, including minimum turnover, insurance levels and registrations?
  • Do any exclusion grounds apply to us, or to a partner we would rely on?
  • Will every certificate the buyer requires be valid on the submission date?
  • Do we have references that meet the buyer's rules on scope, value and dates?
  • Can we submit a complete, compliant response before the deadline, with the people we actually have?
  • Can we accept the contract terms, or are there terms we would refuse to sign?

What to do when a gate fails

A "no" means no-bid, unless there is a concrete fix you can complete in time. Fixes are real options: you can bid with a partner whose capacity covers a gap, or ask a clarification question when a requirement is ambiguous. Write the fix and its owner down. If the fix fails, the answer is no.

These gates are the same items that most often disqualify bids later. Checking them at the start is cheaper than discovering them at submission.

Step 2: Score the weighted criteria

If every gate passes, score each criterion from 1 to 5 and multiply by its weight. The weights below are a starting point for an SME bidding on service contracts. Adjust them to your business once, then keep them stable so scores stay comparable.

Score against the descriptions, not against how much you want the contract. Use 2, 3 and 4 for everything in between. When two reviewers differ by two points or more on a criterion, talk about that criterion before averaging. The gap usually means one of you has read something the other has not.

CriterionWeightWhat a 1 looks likeWhat a 5 looks like
Scope fit20%We would subcontract the core of the workThis is exactly what we deliver every week
Strategic fit15%Unknown buyer, sector or region we don't plan to grow inA target buyer or market we have chosen to grow in
Evidence strength15%References and certificates barely meet the minimumStrong, recent, closely matched references and certificates
Competitive position15%A strong incumbent, and award criteria that favour themNo clear favourite, and award criteria that reward our strengths
Commercial value15%Thin margin after bid and delivery costsHealthy margin and a contract worth the effort
Delivery capacity10%We would need to hire or pull people off live workThe team is available for the full timetable
Risk10%Heavy penalties, unlimited liability or unclear volumesStandard terms and predictable volumes

Step 3: Turn the score into a decision

Add the weighted scores to get a result between 1 and 5. Then apply thresholds you agree on in advance. These thresholds are a starting point, not a rule. After ten or so decisions, look back. If you keep winning from the "discuss" band, lower the bar. If you keep losing from the "bid" band, look at which criterion you scored too generously.

  • 3.5 or higher: bid.
  • 2.5 to 3.4: discuss. Bid only if a named condition is met.
  • Below 2.5: no-bid.

A worked example

This example is fictional. A 25-person IT services company is looking at a framework for digital services from a regional authority. All six gates pass, although one reference is close to the buyer's date limit.

A total of 3.30 lands in "discuss". The team agrees to bid on one condition: the buyer confirms, through a clarification question, that the borderline reference counts. If the answer is no, evidence strength drops, the total falls under 3, and the team passes. Either way, the reasoning is on record.

CriterionWeightScoreWeighted
Scope fit20%40.80
Strategic fit15%40.60
Evidence strength15%30.45
Competitive position15%20.30
Commercial value15%30.45
Delivery capacity10%40.40
Risk10%30.30
Total100%3.30

The bid/no-bid template

Copy this structure into a spreadsheet, with one row per item and one log per tender. Replace the weights with your own, and keep the log in a shared place so the next reviewer can see how earlier decisions were made.

ItemWeightScore or answerNotes and source
Knock-out: mandatory eligibilityGateYes / NoTender clause and our proof
Knock-out: exclusion groundsGateYes / NoChecked by legal or compliance
Knock-out: certificates valid on submission dateGateYes / NoExpiry dates
Knock-out: references meet buyer rulesGateYes / NoWhich references, and why
Knock-out: complete response possible in timeGateYes / NoWho writes what
Knock-out: contract terms acceptableGateYes / NoTerms we would refuse
Scope fit, strategic fit, evidence, competition, value20% and 4 x 15%1 to 5 eachWeight x score, with a line on why
Delivery capacity and risk10% each1 to 5 eachWeight x score, with a line on why
Total and decision100%Bid / Discuss / No-bidCondition, owner, who decided and when

What goes wrong with scoring matrices

Most failures come from when and how the matrix is used, not from the weights.

  • Scoring from the notice: the notice is a summary. Requirements, award criteria and contract terms live in the pack, so analyze the tender pack first.
  • Averaging away a gate: a high total with a failed knock-out is still a no-bid.
  • Scoring after the writing starts: once people have invested a weekend, every score drifts up.
  • One person scoring alone: commercial, technical and compliance reviewers see different risks.
  • Never revisiting the weights: compare scores with results every quarter and adjust.

Record the decision

A decision without a record is a decision you will make again. For each tender, keep the gate answers, the scores with a line on why, the total, the decision, any condition with its owner and date, and who decided. That log becomes part of your tender qualification process, and it is the fastest way to brief someone new.

How TenderFaro helps with this

TenderFaro does not score the tender for you, and it does not decide. It does the reading that the scoring depends on. It extracts requirements and deadlines from the tender documents, links each finding to the passage it came from, and compares the requirements with the certificates, insurance, references and policies in your evidence library. Gaps and potential blockers are flagged for your team to review, and the decision is recorded by the people who make it.

The matrix and thresholds in this article are a practical starting framework from TenderFaro's editorial team, not a legal or industry standard. Eligibility conditions, exclusion grounds and award criteria are set by each buyer within the applicable procurement law, so always check the tender documents.

Frequently asked questions

What is a bid/no-bid matrix?

A bid/no-bid matrix is a short scoring sheet that rates a tender against the same criteria every time, such as scope fit, evidence strength and risk. Each criterion has a weight, and the weighted total is compared with a threshold to decide whether to bid.

When should the bid/no-bid decision be made?

As early as you can, once you have read the full tender pack and before significant writing starts. Some teams also run a quick check again after clarification answers are published.

Who should score a tender?

At least two people with different views, for example a commercial lead and a technical or delivery lead. Compliance or legal should check the knock-out questions on eligibility, exclusion grounds and contract terms.

Can a scoring matrix replace judgment?

No. It structures judgment. A score is only as good as the facts behind it, and some decisions, such as entering a new market on purpose, will reasonably override the number. Write down why when that happens.

What score should trigger a bid?

There is no universal number. A common starting point is to bid at 3.5 or more out of 5, discuss between 2.5 and 3.4, and pass below 2.5. Calibrate after you have scored and tracked a few tenders.

Sources and methodology

This article draws on public procurement guidance and TenderFaro product research. It does not provide legal advice or determine tender eligibility.

Make the evidence behind a bid decision easier to review.

TenderFaro structures requirements, connects company evidence and preserves citations so teams can review the same facts before they decide.

Explore a sample analysis →